• City of Tacoma QA
  • City of Tacoma Data




Pavement, Street and Utility Plans

NOTE: Right-click on any "Filename" below to save document to your computer by selecting "Save Target As"...To view the following files, click on the PDF document.  

 

Download Adobe Reader 

 

For individual plans, click on the subject tab on the left border. To search for a specific document(s), press [CTRL-F]. Enter the search for Example: "Traffic". Press [NEXT] on the browser to find the next search.



Pavement Design

 Filename Description  Date
 PD-01(1) Pavement Design Standards (Sheet 1)  4/4/2016
 PD-01(2) Pavement Design Standards (Sheet 2)  4/4/2016
 PD-02 Pavement Design Worksheet  4/4/2016


Street/Utility Plans

Street Utility Plans PDF (57 pages) - All plans in one file
 Filename Description  Date
 SU-01 Poured Monument  6/09/2009
 SU-02 Precast Concrete Monument  6/09/2009
 SU-03 Cement Concrete Curb and Gutter  8/16/2016
 SU-03A Cement Concrete Curb and Gutter and Asphalt Wedge Curb  8/16/2016
 SU-04 Cement Concrete Sidewalk  4/25/2017
 SU-04A Ballasted Cement Concrete Sidewalk  4/4/2016
 SU-04b(1) Pervious Concrete Sidewalk (Sheet 1)  4/4/2016
 SU-04b(2) Pervious Concrete Sidewalk (Sheet 2)  4/4/2016
 SU-05 Curb Ramp Details, General Information  8/16/2016
 SU-05A Perpendicular Curb Ramp, Type 'A'  8/16/2016
 SU-05B Perpendicular Curb Ramp, Type 'B'  8/16/2016
 SU-05C Combination Curb Ramp  8/16/2016
 SU-05D Parallel Curb Ramp, Type 'A'  8/16/2016
 SU-05E Parallel Curb Ramp, Type 'B'  8/16/2016
 SU-05F Single Direction Curb Ramp  8/16/2016
 SU-05G Detectable Warning Surface Details  8/16/2016
 SU-05H Detectable Warning Surface Placement Guidelines  8/16/2016
 SU-05I

PROWAG Guidelines, Typical Perpendicular Curb Ramp Design Standards

 4/1/2011
 SU-05J PROWAG Guidelines, Typical Parallel Curb Ramp Design Standards  4/1/2011
 SU-06 Minimum Sidewalk Width at Obstructions  8/16/2016
 SU-07 Cement Concrete Access Type 1  4/4/2016
 SU-08 Cement Concrete Access Type 2  4/4/2016
 SU-09 Cement Concrete Access Type 3  4/4/2016
 SU-10 Cement Concrete Stairway  11/30/2010
 SU-11 Stairway Handrail  6/12/2009
 SU-12 Bollard Details  6/12/2009
 SU-13 End of Road Marker  6/12/2009
 SU-14A Typical Pavement Restoration for Asphalt Over Cement Concrete Base Pavement  11/30/2010
 SU-14B

Typical Pavement Restoration for Asphalt Over Rigid Base Brick or Stone Block Pavement

 11/30/2010
 SU-14C Typical Pavement Restoration for Cement Concrete Pavement  11/30/2010
 SU-14D Typical Pavement Restoration for Asphalt Over Cement Concrete Base Pavement  11/30/2010
 SU-14E

Typical Pavement Restoration for Asphalt Over Rigid Base Brick or Stone Block Pavement

 11/30/2010
 SU-14F Typical Pavement Restoration for Pervious Concrete Pavement  4/4/2016
 SU-15A

Typical Pavement Restoration for Asphalt Concrete/Oil Mat Pavement

 6/12/2009
 SU-15B

Typical Pavement Restoration for Asphalt Concrete/Oil Mat Pavement (ROW POLICY EXEMPT)

 7/17/2009
 SU-15C Typical Pavement Restoration for Porous Asphalt Pavement  4/4/2016
 SU-16 Pipe Bedding and Backfill for Sanitary and Storm Sewers  8/16/2016
 SU-17 Manhole Type 1 (48", 54" and 60")  1/17/2014
 SU-18 Manhole Type 2 (72" and Greater)  1/17/2014
 SU-19 Manhole Type 3 (5' Maximum Height)  1/17/2014
 SU-20 Cast-in-Place Manhole Base (0.05 MB)  6/12/2009
 SU-21 Misc Details for Manholes and Catch Basins  6/12/2009
 SU-22 Manhole Frame and Cover  1/17/2014
 SU-23 Lateral Sewer Connection to Sanitary Sewer Main  6/12/2009
 SU-24 Side Sewer Cleanout and Cover Detail  6/12/2009
 SU-25 Utility Adjustment  4/24/2014
 SU-26 Standard Procedure for Marking Construction Stakes  6/12/2009
 SU-27 Potholing  6/12/2009
 SU-28 Trench Backfill Compaction Requirements  11/30/2010
 SU-29 Storm Pipe Through Concrete Curb  4/4/2016
 SU-29A Storm Pipe Through Asphalt Wedge Curb Connection  4/4/2016
 SU-30 Cement Concrete Curb and Gutter Pan  8/16/2016
 SU-31a Permeable Roadway with Impervious Sidewalk  4/4/2016
 SU-31b Permeable Roadway with Pervious Sidewalks  4/4/2016
 SU-31c Permeable Roadway with Planting Strip  4/4/2016
 SU-32 Permeable Pavement Terraced Subgrade  4/4/2016
 SU-33 Trench Dam  4/4/2016
 SU-34 Sign Post Installation  4/4/2016
 SU-35 Permanent Roadway Terminus Type 3 Barricade  4/4/2016
 SU-37 Valve Chamber Collar Detail  5/31/2017